Indonesia has established 70 Geothermal Working Areas from 342 geothermal areas/locations within Indonesia. There are 123 geothermal locations/geothermal areas in this 70 WKPs, a WKP may consist of multiple (2,3,4) geothermal areas or only one geothermal area.

The status of 70 WKPs are; 11 WKPs already in production; 10 WKPs in construction phase; 8 WKPs in exploration drilling; and 11 WKPs in exploration phase (not yet drilling), while 30 WKPs are in preparation for tender and assignment process. Total capacity of those 70 development WKPs more than 7.5 GW. Base on RUPTL PLN 2018-2027, Indonesia plan to add 4583 MW of new geothermal plant for the next 10 years.

PROVINCE GWA NAME DEVELOPER
Nangroe Aceh Darussalam Jaboi PT. Sabang Geothermal Energy
Seulawah Agam PT. Geothermal Energi Seulawah
North Sumatra G. Sibayak - G. Sinabung PT. Pertamina Geothermal Energy
Simbolon-Samosir N/A
Sipoholon - Ria Ria N/A
West Sumatra Bonjol N/A